B2133 Crossing


hole in pavement
October 14, 2006. Work starts on moving the utilities in preparation for the contruction of the bridge over the canal. (Photo: Eric Walker)

cross on road
The white cross marks the new position for the sewer manhole. (Photo: Eric Walker)

45 tonne digger
The Burras 45 tonne excavator arrived. This will be used for sewer diversion work which will be completed this year. Oct. 14,2006 (Photo: Eric Walker)

45 tonne digger
Working party volunteer Rob Taylor uses the 45 tonne digger to remove some tree stumps. (Photo: Eric Walker)


Part 1 of Loxwood Lock construction.
Part 2 of Loxwood Lock construction.
Part 3 of Loxwood Lock construction.
Part 4 of Loxwood Lock construction.
Part 5 of Loxwood Lock construction.
Part 6 of Loxwood Lock construction.
Part 7 of Loxwood Lock construction.
Part 8 of Loxwood Lock construction.
Piling on the Onslow Pound.
Lowering Brewhurst lock.