Progress at Drungewick Lock. The offside (west) chamber wall above the downstream paddle culvert has been taken down
to the invert. Since the pictures were taken in November 2003, the wall has been built up two courses of 'stone' and backfilled with concrete.
Dec. 7, 2003.
Dec 14, 2003.
Making the concrete blocks.
The repairs on or about Dec. 21. 2003
David Southgate braves the weather
Eddie Fairman consolidates the concrete in the former void behind the quoin
At he end of another January day (Jan 11, 2004) Dusty Miller looking into the abyss left where the sheet piling has been removed
The repair completed.
The winding hole cascade.
The start of pointing.
Down the lock ladder, four layers of scaffolding boards.
Two bays of scaffolding moved and Dusty Miller (in red) with wellies full!