HAYBARN BRIDGE REBUILDING - 2
Assembling the main thrust bearing.
The mobile crane starts to lift the bridge into position. Oct 21, 2004.
Lowering the bridge onto its bearing.
Aligning the bridge with the pivot pin.
Another view of the pivot alignment.
The bridge lowered into position on its bearing. Oct 21, 2004.
A view taken from about the same position as the first picture on page 1.
A view taken from the south on May 26, 2005.
A view taken from the north east on May 26, 2005.
A view taken from the north west on May 26, 2005.