HAYBARN BRIDGE REBUILDING - 2
the pivot bearing
Assembling the main thrust bearing.
crane lifting bridge
The mobile crane starts to lift the bridge into position. Oct 21, 2004.
craning the bridge
Lowering the bridge onto its bearing.
craning the bridge
Aligning the bridge with the pivot pin.
craning the bridge
Another view of the pivot alignment.
bridge in position
The bridge lowered into position on its bearing. Oct 21, 2004.
bridge in position
A view taken from about the same position as the first picture on page 1.
finished bridge
A view taken from the south on May 26, 2005.
finished bridge
A view taken from the north east on May 26, 2005.
finished bridge
A view taken from the north west on May 26, 2005.

Back to Haybarn Part 1.


Last updated May 2005