Loxwood New Lock - 9


loxwood lock bridge
With the completion of the earthworks to the east of the B2133, the spoil removed for the New Lock and which had been temporarily dumped in the canal, is now being removed to the field near Devil's Hole Lock. Picture taken on Sept. 12, 2006. (Photo: Richard Emsley)

loxwood lock
The bridge is almost complete and an area on the offside has been turfed. Oct. 4 2006. (Photo: Richard Emsley)

loxwood lock
The canal to the west of the New Lock has been dug out and re-profiled. (Photo: Richard Emsley)

making coping stones
Coping 'stones' for the bridge parapets being cast on Nov. 1, 2006. (Photo: Richard Emsley)

loxwood lock
The bridge almost complete on Nov. 2, 2006. The coping 'stones' have been fitted to the right hand end of the bridge. (Photo: Richard Crook)

loxwood lock bridge
On Nov. 16, 2006, the copings are almost complete and the scaffolding removed. The green box on the left is to house the back pumping control equipment. (Photo: Richard Emsley)

loxwood lock
Dec 6, 2006, after heavy rains the pound above the lock is almost full. (Photo: Phil Broadley)

loxwood lock
The water level below the New Lock is well above the operating level which will be established once the bridge/tunnel under the B2133 is completed. (Photo: Phil Broadley)

loxwood lock
Loxwood New Lock on Jan 7, 2007. The stop planks have been fitted, electricity connected and preparations are in hand to install the back pumps. (Photo: Bill Nicholson)

loxwood lock
Loxwood New Lock on May 21, 2007. The 'tidy up' is almost complete and both sides of the lock have been grassed. . (Photo: Richard Emsley)

loxwood lock
Loxwood New Lock on May 21, 2007. Viewed from the B2133 road end. In the foreground is parapet of the horse bridge. (Photo: Richard Emsley)


Part 1 of Loxwood Lock construction.
Part 2 of Loxwood Lock construction.
Part 3 of Loxwood Lock construction.
Part 4 of Loxwood Lock construction.
Part 5 of Loxwood Lock construction.
Part 6 of Loxwood Lock construction.
Part 7 of Loxwood Lock construction.
Part 8 of Loxwood Lock construction.
Moving the utilities.
Piling on the Onslow Pound.
Lowering Brewhurst lock.
Lowering Onslow Pound.
Lowering Onslow Pound Part 2.