Lowering the Onslow Pound 3.


boats on Onslow pound

onslow boats

onslow boats

onslow boats
Photographed on March 29, 2007, the trip boats had been returned to their moorings at the Onslow arms. (Photos: Derek Heath )

towpath-onslow
The newly surfaced towpath at the rear on the Onslow arms which now extends to the edge of footpath on the B2133 . May 21, 2007. (Photo: Richard Emsley)

onslow towpath
As above viewed from the opposite direction. (Photos: Richard Emsley)

zk onslow wall
ZK at its moorings with the newly constructed stone wall retaining the garden of the Onslow Arms. (Photo: Julian Morgan)

onslow towpath
A closeup of the wall showing the high quality workmanship achieved by the volunteers. (Photo: Julian Morgan)

onslow coping stones
The almost complete line of coping stones along the moorings. (Photo: Chalky White)


Part 1 of Loxwood Lock construction.
Part 2 of Loxwood Lock construction.
Part 3 of Loxwood Lock construction.
Part 4 of Loxwood Lock construction.
Part 5 of Loxwood Lock construction.
Part 6 of Loxwood Lock construction.
Part 7 of Loxwood Lock construction.
Part 8 of Loxwood Lock construction.
Part 9 of Loxwood Lock construction.
Lowering Brewhurst lock Part 1.
Lowering Onslow Pound Part 1.
Lowering Onslow Pound Part 2.
Piling on the Onslow Pound.

BACK

Last updated November 19, 2007